With a clear focus on customer satisfaction we offer our clients a reliable and quality clash detection and BIM coordination services. With our clash detection experts, we reduce the amount of change orders during construction through our risk free model inspection while initiating automated clash checks.
We provide a Coordination Summary reports or CSR after performing the clash tests. We use Autodesk Navisworks platform for clash checks.
The Coordination Summary involves all the Clashes incurred, Exact location of the Clash and a possible Solution for the clash. With the generated reports, our BIM Coordinators work closely with Architects, Structural Engineers and MEP contractors for clash resolutions.
With our Clash Detection & 3D BIM Coordination Services, we help our clients improve project planning and avoid budget overruns by reducing rework and material wastage during site execution.
What We Do
Clash Detection
Determine all the possible clashes in the project using tools like Autodesk Navisworks.
Time based Clashes
Identify time-based clashes along with 4D Construction Sequencing.
Clash Reports
A detailed coordination summary or clash reports are provided after the automated clash checks.
Clash Mitigation Support
Our expert engineers suggest remedial solutions for quick mitigation of clashes identified.
Snapshots
Our Clash Detection Process
Our clash detection services involves a 4 stage process starting with the preparation of the NWC Files from all the stakeholders involved in the project. i.e.; the NWC files from Architects, Structural Engineers and MEP Engineers are collected by our BIM Coordinator.
Clash Tests Templates are developed based on a Clash Matrix prior to the start of the process. The Clash Matrix defines the number Clash Tests, Clash Types (Hard or Clearance Clash Test), Clash Scenarios (First Order, Second Order & Third Order) etc.
A Clash Detection Workshop is conducted and Clash Tests are run based on the Clash Test Templates developed. Individual Clashes are identified and shall be categorized as New/ Active, Reviewed, Approved and Resolved.
Clash Reports are generated at the end of the process and is distributed among the project stakeholders to start with the clash resolution process.
Below chart describes our clash detection process.